Material handling in construction
In the construction industry, the term 'material handling' refers to the delivery, movement, storage and control of materials and other products. This forms part of the logistics management of a project.
Types of plant used for material handling on site include; hydraulic excavators, telescopic handlers, cranes, forklift trucks, lifting devices, conveyor systems and so on.
From receipt and inspection of materials, through to storage, assembly and use, the material handling system should be well-coordinated and organised so that everyone on site is aware of how it works. When handling materials, safety should be the primary consideration. Pre-start inspections are critical, load limits should not be exceeded, method statements should be followed, and it may be necessary for a banksman to direct material movements around the site.
It is important to follow best practice guidelines when designing a material handling system for a construction project. For example:
- The proposed system of material handling should be defined in terms of needs, objectives and functional specification.
- Methods and processes should be standardised to avoid confusion.
- Unnecessary handling or movement should be reduced or eliminated.
- Working conditions and methods should have worker safety as the primary objective.
- Unit loads should be optimised, to reduce work and risk.
- Storage areas should be kept organised and clean, maximising density as much as possible and eliminating damage to materials.
- Sites should be kept safe, clean and easy to move around.
- Deliveries should be received and handled promptly.
- Site waste management plans should be created and maintained.
- Automated material handling technologies should be used where practicable.
- Safety equipment such as PPE should be available.
Incorrect manual handling is a common factor in work-related injuries. This can be because of:
- The weight of the item being handled.
- The repetitive nature of the movement.
- The distance the item is being moved.
- Where the item is being moved to and from.
- The posture of the individual. Any twisting, bending, stretching or other awkward position may exacerbate problems.
The Manual Handling Operations Regulations place obligations on employers to manage the risks of manual handling to their employees. For more information see: Manual handling.
[edit] Related articles on Designing Buildings Wiki
- Construction materials.
- Construction plant.
- Don’t run short of materials on your construction project
- How to manage construction plant.
- Logistics management.
- Manual handling.
- Materials on site.
- Off site materials.
- Protecting and storing rebar.
- Quality control.
- Resource management plan.
- Site storage.
- Site Waste Management Plan.
Featured articles and news
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.






















Comments
Good points, we wrote a similar guide but aimed more specifically at the groundworks sector: https://www.sitestak.co.uk/news/how-to-store-pvc-drainage-materials-and-pipe-prior-to-installation